Ablitas Solar Farm - 8.8 MWp -  UNDER CONSTRUCTION - 2011


Ablitas

Total installed power in kWp 8,802.00
Annual Energy Generated 11,053,570.00
RP 82
Year 2011
Number of Trackers Estructura fija
MECASOLAR tracker power: 500.00
Inverters Installed INGECON SUN 500HE
Equivalent Consumption (Homes) 3,860
Avoids emissions of Tons of CO2 11,850
Equivalent to photosynthesis 591,950
Total Hectares Occupied 27.00
Location: Industrial area and Plot Parcela 1893, polígono 5
Town Ablitas
Province Navarra
Country España




The Information about Ablitas Solar Farm in Navarra, available soon.


You can register on our waiting list by following the instructions on the Registration page.

 

 

Image gallery

 

 

SPAIN
Opde Promoción de Plantas Solares Pol. Ind. Santos Justo y Pastor, s/n
31510 Fustiñana, Navarra
ESPAÑA
Tel : (+34) 902 106 264
          (+34) 948 840 985

Fax
: (+34) 902 108 402
          (+34) 948 840 702

opde@opde.net
www.opde.net
ITALY
Opde Promoción de Plantas Solares Via Vittime di Piazza Fontana 1
10024 Moncalieri (TO)
ITALIA
Tel : (+39) 011 62036100
Fax : (+39) 011 62036200

www.opde.net
GREECE
Opde Promoción de Plantas Solares BI.ΠΕ. Θεσσαλονίκης
Οικ.Τετράγωνο 40, ΔΑ 12α,

Section1392
57022 Σίνδος
ΕΛΛΆΔΑ
Tel : (+30) 2310 799 209
Fax : (+30) 2310 570 597

www.opde.net
USA
1430 Enterprise Blvd,
West Sacramento,
CA 95691
UNITED STATES

Tel : (+1) 916 374 8722
Fax : (+1) 916 374 8063

usa@opde.net
www.opde.net
© Agoranet