Home>Solar farms>Tietar
| Total installed power in kWp | 1.563,52 kWp |
| Annual Energy Generated | 3.048.854,25 kWh |
| RP | 1950 kWp/kWh |
| Total Investment | 12.820.823 |
| Year | SEPTEMBER-08 |
| Number of Trackers | 140 MS-2E TRACKER 10 |
| MECASOLAR tracker power: | 11 kWp |
| Inverters Installed | SMA Sunny Boy 3311 |
| Equivalent Consumption | 972 (Homes) |
| Avoids emissions of Tons of CO2 | 2.983 CO2 |
| Equivalent to photosynthesis | 148.977 trees |
| Total Hectares Occupied | 14,28 Ha |
| Location: Industrial area and Plot | Industrial area 33 plots 56 y 60 |
| Town | Tietar |
| Province | Caceres |
| Country | España |
| Google Earth |

The works on the 1.4 MW Solar Plant at Tietar located in the province of Cáceres, will become operational within the RD 661/2007. This plant comprises 140 MECASOLAR trackers of 11 kWp. It will be registered on the final REIPRE before September 28, 2008. The building work has made good progress and is at an advanced stage and a request will be made before September 28 to register on the final REIPRE. The estimated production for this solar plant will be 2000 kWh / kWp installed. This plant is very close to the 20 MW Almaraz and 2.5 MW Belvis de Monroy, Solar Plants which will also be connected before September 28, 2008.
You can register on our waiting list by following the instructions on the Registration page.